葫芦岛市100c2、100c3底压分解设备清洗项目工期过半,清洗团队日夜奋战中,在清洗100c3大机组润滑油系统的过程中出现了一些小问题,但是最终结局圆满。这也充分体现了团队协作的强大力量。
此次项目采用化学清洗,在进行100c3底压分解设备中的管道清洗时,甲方对我们的废液无害化处理的方案提出质疑,双方在进行一番交流后,化验员在之前的处理方案的基础上进行了模拟效果分析的实验,化验数据征服了甲方,在这一过程中,我公司的化验员与甲方的充分交流技术方案,最后达成一致。
不管是清洗油系统管线还是管道,9人清洗团队都始终做到了团结协作,对于各类清洗剂添加的时间控制更是不允许有一丝失误。刘经理对整体项目各项工作的人员配置也体现了资源的最大化利用原则,每个人都在各自岗位坚守。
Huludao 100c2 and 100c3 bottom pressure decomposing equipment cleaning project has more than half of its construction period. The cleaning team worked day and night, and there are some minor problems in cleaning up the lubricating oil system of 100c3 large unit, but the final result is satisfactory. This also fully embodies the powerful force of teamwork.
This project uses the chemical cleaning, pipeline cleaning in 100c3 bottom pressure decomposition equipment when the party questioned our waste harmless treatment scheme, both in a communication, the basic laboratory technician treatment scheme before the simulated effect analysis experiment, test data to conquer the party and in this process, the full exchange of technical scheme and laboratory technician of our party, the final consensus.
Whether it is cleaning the oil system pipeline or pipeline, the 9 Party cleaning team has always been united and cooperative. It is not allowed to make any mistakes for the time control of all kinds of cleaning agents. Manager Liu’s staffing of the whole project also embodies the principle of maximizing the utilization of resources, and everyone is stuck in their respective positions.